Solar Park Watch · Report SPW-DEMO-0000
Site: DEMO Solar Park
- Quarter
- Q2 2026
- Coordinates
- 00.0000, 00.0000
- Capacity
- 00.0 MWp
- Country
- DEMO
1 · Fuel-load index around the perimeter
Vegetation density per buffer ring, derived from the most recent cloud-free acquisitions of the quarter and compared with the previous quarter.
| Buffer ring | Fuel load | Observation |
|---|---|---|
| 0 – 50 m | Low | Cleared gravel and mown strip |
| 50 – 150 m | Moderate | Grassland with scattered shrub |
| 150 – 500 m | Elevated | Continuous shrub, unmanaged |
| 500 – 1000 m | Elevated | Mixed scrub and pine edge |
2 · Firebreak status
North fence
Gap 40 m
East fence
Continuous
South fence
Continuous
West fence
Narrowed
Illustrative finding: one discontinuity in the cleared strip along the northern boundary, adjacent to unmanaged shrub.
3 · 10-year fire-history map
10 km radius · schematic
| Year | Distance | Burnt area |
|---|---|---|
| 2023 | 3.4 km NE | 412 ha |
| 2021 | 7.8 km E | 1 260 ha |
| 2019 | 2.1 km S | 96 ha |
| 2017 | 9.2 km NW | 2 040 ha |
4 · Dryness trend
Quarterly dryness indicator for the site grid cell; higher values indicate drier conditions relative to the multi-year baseline.
5 · Mitigation checklist
- Perimeter strip cleared to specified widthObserved
- Firebreak continuity along northern fenceGap identified
- Internal access track passable for fire vehiclesObserved
- Vegetation under module rows managedPartially observed
- Adjacent parcel clearance agreement documentedOutstanding
Methodology annex (in the delivered PDF): source products, acquisition dates, processing steps, buffer definitions and known limitations such as cloud cover and imagery resolution.